01 · RESPONSIBILITY
The engineer signs.
Everything before that_
OUR WORKING RULES · 8 PRINCIPLESHow we work with AIResponsibility does not pass to the tool. Every number is traceable.Read the rules →
02 · CONTROL
Every decision
with its own clause.
XC1 · S4, no reduction per Tab. 4.3N → cmin,dur = 15 mm → EN 1992-1-1:2004, Tab. 4.4N
cmin = max(Ø10; 15; 10) = 15 mm → 4.4.1.2
cnom = 15 + Δcdev 10 [NDP] = 25 mm · cprov = 30 mm → 4.4.1.3
R 90 · b = 300 ≥ 250 · a = 48 ≥ 25 mm → EN 1992-1-2:2004, Tab. 5.6
C30/37 · B500 · Ø16 · η1 = 0.7 · σsd = fyd · α = 1 → lb,rqd = lbd = 817 mm → 8.4.3, 8.4.4
ab = 48 · lstr = 300 (DCL, no −5φ) · Fbt = 55 kN · αcc = 1 [NDP] → φm,min = 144 ≤ 160 mm · Tab. 8.1N gives 64 → 8.3(3), (8.1)
03 · CODES
30.03.2028. · CEN DoW
515
DAYS · 03 H
First-generation Eurocodes are withdrawn.
The second generation is already published.
From formwork
to drawings.
No new solver. No new CAD.
A layer between tools the profession already trusts.
See the chain ↓
04 · CHAIN

One model.
Every step leaves a record.

DWGSAFIFC4
FORMWORK → MODEL → ANALYSIS → REINFORCEMENT → DRAWING
  1. 01
    Formwork
    CAD · LAYER STANDARD
    Drawn to a layer standard. Levels, slopes and rotated sections by command.
  2. 02
    Model
    SI · MODELING
    Grid, tables, 3D. The same model goes to analysis, coordination and BIM.
  3. 03
    BIM model
    SI · FORMWORK
    Levels, grids, walls, beams, slabs from formwork drawings. For refurbishment, shoring and a demolition phase too.
  4. 04
    Analysis
    PROVEN SOLVERS
    Through SAF and IFC the model goes to any proven solver. We do not write our own.
  5. 05
    Reinforcement
    SI · REBAR · EN 1992 · EN 1998
    Bars, hooked stirrups, anchorage into columns. From the analysis, not from a dialog box.
  6. 06
    Drawings
    DWG · TO OFFICE STANDARD
    Sheet, schedule, bar marks. The signature stays with the engineer.
05 · TOOLS

Built for our projects.
Used on them.

SI · CAD

Drawing that is not drawn by hand.

VKNAGIBOBORENIKOTAUNKOTAVAN

Draw a section line across the plan; the tool reads the layers and draws the rotated section with hatching and dimensions. Exterior dimensions in four tiers with one command. Scale is asked once and stored in the drawing.

SI · MODELING

One model, several outputs.

SAF 2.0IFC4

Grid-based drawing and tabular input in one window. EN 1990 combinations generated from actions, not typed by hand. Modal analysis and EN 1998-1:2004 response spectrum. Works offline.

SI · FORMWORK

BIM model from formwork drawings.

The BIM structure is built from the drawing that already exists. In repair and refurbishment work, existing elements, shoring, demolition and new work sit in their own phases. Drawing deviations are not auto-corrected: in existing buildings they are real.

SI · REBAR

Reinforcement that knows why.

Slabs by zone, columns, beams, stirrups with 135° hooks densified at the joints, beam anchorage into columns with the mandrel checked to EN 1992-1-1:2004, 8.3(3), expression (8.1). Links and critical regions to EN 1998-1:2004 where the ductility class requires it. Every number keeps a record of where it came from. Fabrication class is set per project: manual, or machine-fabricated with no bar clashes.

06 · CONTROL
The engineer no longer enters reinforcement.
The engineer reviews it.

Existing tools automate input through dialog boxes, and the decision stays invisible. Here it is the other way round: the decision is recorded with its source and reviewed before it reaches the drawing.

Two solvers, one modelreactions · periods · displacements · forces
Independent check of third-party designsan independent model, not reading the report
Durability and fireexposure class → c_nom · R → axis distance a
Rules in one placeEN 1990:2002 · 1992-1-1/-2:2004 · 1997-1:2004 · 1998-1:2004
Open formatsthe model is not locked into one program
$ instructa check --en 1992
> in use · iNSTRUCTA_
Interested?
Get in touch.

Have a specific building? Send a request for proposal: scope and inputs in one place, proposal after review.